The path to grid connection
Going live in four stages
Connecting to the grid is not a single step, but a process: from finding a suitable location, through obtaining planning permission and connecting the cables, to feeding electricity into the grid. We keep track of every stage and ensure they all run smoothly. The grid operator determines the grid connection point – generally the most favourable one, which is usually the nearest connection point. The earlier we are involved, the more predictable your schedule will be.