Grid connection: A secure connection for your substation

The grid connection is the crucial link between your generation or storage facility and the public electricity grid. Connecting to the 110 kV grid is one of the key challenges in the construction of substations for wind, solar, battery storage and hydrogen projects. As an experienced main contractor specialising in substation construction, WT Energiesysteme has expertise in all standard grid connection options and integrates them safely and efficiently into turnkey projects – from the greenfield stage right through to handover.

WT Energiesysteme carrying out installation work on a high-voltage overhead line connection using an aerial work platform, with switchgear and a transmission tower.

Everything from a single source – with no detours

High level of in-house production thanks to our own pipeline construction team

A key advantage of our power line connection service is our in-house line construction team. Thanks to this high level of in-house capability, we carry out key aspects of the 110 kV power line connection using our own qualified specialist staff – without relying on subcontractors. This offers you clear advantages:

  • Short decision-making processes and a single point of contact

  • High-quality workmanship and processes, all from a single source

  • Maximum reliability in meeting deadlines thanks to our own dependable resources

  • Full cost control throughout the entire project

Compliant with standards and future-proof

Connection plan drawn up in close consultation with the network operator

We always select the appropriate connection concept in close consultation with the relevant grid operator, taking into account the technical and local constraints. In this way, we ensure that your substation is connected to the 110 kV grid in accordance with standards and in a future-proof manner. From technical planning through construction to the commissioning of the grid connection, we support you as your main contractor. Approval procedures and land-related matters remain the responsibility of the client or the grid operator.

A partner from the ground up to handover

Your grid connection as part of the turnkey substation

At WT Energiesysteme, grid connection is not a stand-alone service, but an integral part of our turnkey substation solutions. Whether it’s a wind farm, solar farm, battery energy storage system (BESS) or hydrogen plant – we ensure that your facility can feed electricity into the grid on time and without disruption. With over 20 years’ experience and more than 250 substations completed, we are your reliable partner for the energy transition.

Answers at a glance

Frequently Asked Questions about the grid connection

A grid connection in the 110 kV range refers to the technical connection of a facility – such as a substation – to the grid operator’s high-voltage network. The electricity generated or stored is fed into the public grid via this connection. Proper installation is crucial for safe and trouble-free operation.

Your contact person

Talk to us about your grid connection

The sooner we are involved, the easier it will be to plan your grid connection. Let’s go through your project together.