WT Energiesysteme – Substations and grid connections up to 380 kV

WT Energiesysteme GmbH, headquartered in Riesa, is one of the leading specialists and main contractors for the design, construction, commissioning and modernisation of substations and grid connections in the voltage range from 10 to 380 kV. We deliver turnkey substations from a single source, bringing together all the essential trades and expertise within our own company. We create high-performance and reliable grid infrastructure for project developers, investors, energy suppliers, grid operators and industrial companies.

Electrical substation with two power transformers, high-voltage switchgear and grid connection point for connecting wind turbines to the power grid.

Turnkey solutions from a single source

What sets us apart

All trades under one roof

Our extensive in-house capabilities, covering engineering, manufacturing, assembly, commissioning and service, are our key strength.

Turnkey substations up to 380 kV

As a main contractor offering standardised plant designs, we enable our customers to benefit from short lead times and rapid availability of all components.

Core competence with a high degree of in-house production

Planning, construction and maintenance of substations across the entire value chain, with minimal dependencies. Tested quality, certified to ISO 9001, 14001, 45001 and SCC**.

From concept to operation – the entire value chain

We support your project every step of the way. This ensures that interfaces and interdependencies are kept to a minimum. Feasibility study · Approval · Planning; Control cabinet manufacture · Plant construction · Electrical installation; Grid connection · Commissioning; Service.

Aerial view of a battery storage plant with substation, battery containers, solar park and wind turbines

Operations building, 110 kV connection

Medium-voltage switchgear and control for the grid connection

High-voltage transformer

Transformation from 33 kV to 110 kV

Operations building for controlling the battery system

Houses the BMS (battery management system), the EMS (energy management system) and the power plant controller for the grid connection

Battery container

Capacity of up to 6.5 MWh

Power conversion system

Conversion from DC to AC voltage, including a step-up transformer from 690 volts to 33 kV

Medium-voltage switchgear and control for the grid connection

Sectors

Who we work for

We work primarily with project developers and investors – as well as with energy suppliers, grid operators and industry.

Project developer

Substations for wind and solar farms; projects exceeding 20 MW.

Investors & Tenders

Turnkey implementation for tender projects.

Energy suppliers & network operators

Grid connection and modernisation of the existing grid.

Industry & Large-scale Consumers

Own grid connections and substations.

Head office in Riesa

WT Energiesysteme: Facts and Figures

2002

over 25 years’ experience

250+

substations completed

200

Staff

10–380 kV

Voltage range

Outlook

380 kV and battery storage – we’re growing alongside the energy transition

In addition to our core business of 110 kV substations, we are systematically expanding our portfolio. We have entered the 380 kV extra-high voltage sector and established our own business division for battery energy storage systems (BESS) under the WT Energiespeicher brand.

Frequently Asked Questions

Frequently Asked Questions

Specialists in the design, construction, commissioning and modernisation of substations and grid connections up to 380 kV – offering turnkey solutions from a single source, with headquarters in Riesa (Saxony).

Your partner at every stage of your project

Your substation project – let’s discuss it

From feasibility to commissioning: we deliver your project on a turnkey basis.