From testing to handover
What happens at the end of the commissioning test
From partial discharge measurements right through to end-to-end testing at the control centre, you will receive comprehensive evidence of your system’s fault-free condition and operational readiness – in accordance with applicable standards and network operator specifications. Where the measurement results suggest it, we optimise settings and parameterisation for continuous operation. Finally, we train your operating staff and hand over a tested, operational system to you.
Examination requirements
What we check before commencing operations
From partial discharge testing to functional testing of the entire system – we provide verifiable evidence of every test and document the results against the permissible limit and reference values.
Everything under one roof
Your commissioning test, all under one roof
From partial discharge testing to telecontrol testing, we provide a one-stop service for all testing requirements for your medium- and high-voltage installations – carried out in accordance with standards and fully documented. Please contact us for a no-obligation quote for the commissioning test of your substation.
Good to know
Frequently asked questions about the commissioning of substations
The duration depends on the size, voltage level and complexity of the installation and typically ranges from a few days to several weeks. The key factors are the scope of the protection and telecontrol tests, as well as the number of fields and pieces of equipment. Following a review of your plant documentation, we will draw up a binding timetable and schedule that fits in with your project timeline.
Your contact person
Please get in touch with us to discuss your commissioning test
The sooner we are involved, the better the audit will fit into your schedule. Let’s go through your plans together.
Robert Stefaniak
Sales Manager