Vesbeck Substation

110 kV Grid Connection — Highly Efficient Construction Phase

Side view of a power transformer at an electrical substation in the evening sunlight. The transformer features cooling radiators and high-voltage bushings and is installed on a concrete foundation with an oil containment basin.

Thanks to forward-looking planning, precise coordination, and close cooperation among all parties involved, the project was successfully completed on November 4, 2025.

Another positive aspect worth noting is that the utility connection was completed on time. As a result, no additional power supply via a diesel generator was required during the testing phase. These generators typically consume about 120 liters of fuel per day during normal operation, which resulted in significant savings.

Vesbeck is an example of how we successfully bring projects to completion through expertise, coordination, and team spirit.

Your Contact Person

Talk to us about your 110-kV project

The sooner we're involved, the easier it will be to plan your grid connection. Let's go over your project together.