• WT Energiesystems
  • WT Energiesystems
  • WT Energiesystems
  • Västerås +46 (0) 10 20 98 731
    Umeå +46 (0) 10 20 98 734
  • Tyskland +49 (0) 3525 513 28 62
    • Hem
    • Företaget
      • Data och fakta
      • Om oss
      • History
      • Markets
      • Funding
      • MILJÖSKYDD / ARBETSMILJÖ
      • Pre-qualifications / certificates
      • Mässan
      • Downloads
    • Transformator station
      • Specialist areas
      • Output of transformer stations
    • Switch cabinets
      • Performances of switch cabinets
      • Types of switch cabinets
    • Referenser
    • Nyheter
    • Lediga jobb
      • Varför väljer WT-Energisystem?
      • Lediga jobb
    • Kontakt
    • SvenskaSvenska
      • DeutschDeutsch
      • EnglishEnglish
      • SvenskaSvenska

Blog

Home 2020 januari 22
Umspannwerk Güssefeld

transformer station Güssefeld

  • 22. januari 2020
  • Referenzen

In June 2006, the substation Güssefeld was handed over ready for operation. Energiequelle GmbH was pleased to announce that WT Energiesysteme GmbH was again able to impress with punctuality. The

  • Read more...
umspannwerk sassleben

Transformer station Saßleben

  • 22. januari 2020
  • Referenzen

In the Calau supply network, PNE Wind AG expanded the field of regenerative energy with additional wind turbines. This required the construction of a new switchyard and switchgear. The substation

  • Read more...
Umspannwerk Rielasingen

transformer station Rielasingen EVU-UW

  • 22. januari 2020
  • Referenzen

The UW Rielasingen was part of a Swiss ring. In this ring, which was powered exclusively by the Swiss side, 4 UWs were interconnected. The challenge was in addition to

  • Read more...
messe

WT Energiesysteme at the following fairs

  • 22. januari 2020
  • Messen

WT Energiesysteme will be represented at the following fairs: Hannover – HANNOVER MESSE – 24.-28.04.2017 – Hall 13, Stand B54 Husum – HUSUM Wind – 12.-15.09.2017 – Hall 4, Booth

  • Read more...
international

Onshore wind farm in Markbygden north sweden

  • 22. januari 2020
  • Referenzen

At around 4GW, Markbygden will be the largest onshore wind farm in Northern Sweden at one location in Europe and will increase the installed base of wind turbines in Sweden

  • Read more...
referenz juwi

transformer station Baumgarten Süd

  • 22. januari 2020
  • Referenzen

In May 2017, Juwi Energieprojekte GmbH commissioned WT Energiesysteme GmbH to create a ready-to-use substation on a turnkey basis. The service description includes all services up to the handover of

  • Read more...
Umspannwerk Prutz in Österreich

transformer station Prutz 110 kV field extension line GKI 1 and GKI 2

  • 22. januari 2020
  • Referenzen

WT Energiesysteme GmbH has been awarded the contract to extend the 220/110/25 (30) kV transformer station Prutz with two 110kV power lines GKI 1 and GKI 2. The following services

  • Read more...
WT Energiesysteme Umspannwerk in Honsbronn

110/33kV transformer station Honsbronn

  • 22. januari 2020
  • Referenzen

On 30.05.2018, the 110 / 33kV transformer station Honsbronn was handed over to the customer on schedule and ready for operation. The deliveries and services provided by WT Energiesysteme included,

  • Read more...
referenz wkn

Transformer station Bischdorf Süd III

  • 22. januari 2020
  • Referenzen

A 110/30 kV substation is currently being built on the green meadow near Kittlitz in Brandenburg. WKN AG commissioned WT Energiesysteme with the turnkey construction of the substation, including a

  • Read more...
umspannwerk zimmern

Transformer station Zimmern

  • 22. januari 2020
  • Referenzen

On time on 30.08.2018, the 110/20 transformer station Zimmer went to the TEN network. The company EDF EN Germany GmbH commissioned WT Energiesysteme GmbH to create a ready-to-operate substation with

  • Read more...
  • 01
  • 02
  • Next
  • Last

Kategorier

  • Allgemein
  • General
  • Messen
  • References
  • Referenzen

Senaste nytt

  • Preisverleihung Großer Preis des Mittelstandes
    WT Energiesysteme GmbH receives the award as a finalist in the “Großer Preis des Mittelstandes” (Grand Prix of Medium-Sized Enterprises)
    0
    29. september 2021
  • Husum Wind 2021
    HUSUM Wind Fair – “going where the wind blows”
    0
    29. september 2021
  • Wirtschaftspreis 2. Stufe
    Stage 2 – Nomination for the Business Award
    0
    6. maj 2021
  • Crefo 2021
    Renewal of the CrefoZert creditworthiness certificate
    0
    6. maj 2021
  • Erster Spatenstich Neubau Riesa
    Groundbreaking ceremony for the new building in Riesa
    0
    6. maj 2021

Tags

Fair Finalist Husum HUSUM Wind Prize Wind

Transformer station

WT Energiesysteme GmbH specialises in the construction, maintenance and modernisation of transformer stations or grid feeds – with an output that ranges from 10 to 380 kV.

Here we offer our services as individual or complete services.

Switch cabinets

A distinction is made between switch cabinets, protective cabinets and control cabinets as well as telecontrol cabinets. The WT Energiesysteme GmbH plans and constructs all three variants in a tailor-made manner in accordance with your requirements.

Senaste nytt

  • Preisverleihung Großer Preis des Mittelstandes
    WT Energiesysteme GmbH receives the award as a finalist in the “Großer Preis des Mittelstandes” (Grand Prix of Medium-Sized Enterprises)
    0
    29. september 2021
  • Husum Wind 2021
    HUSUM Wind Fair – “going where the wind blows”
    0
    29. september 2021
  • Wirtschaftspreis 2. Stufe
    Stage 2 – Nomination for the Business Award
    0
    6. maj 2021

Kontakt

WT Energisystem AB
Iggebygatan 12
721 26 Västerås
Sverige

+46 (0)10 209 87 30

info@wt-energisystem.se

    • Legal notice
    • Privacy Policy
    • General conditions of sale