In June 2006, the substation Güssefeld was handed over ready for operation. Energiequelle GmbH was pleased to announce that WT Energiesysteme GmbH was again able to impress with punctuality. The

Transformer station Saßleben
In the Calau supply network, PNE Wind AG expanded the field of regenerative energy with additional wind turbines. This required the construction of a new switchyard and switchgear. The substation

transformer station Rielasingen EVU-UW
The UW Rielasingen was part of a Swiss ring. In this ring, which was powered exclusively by the Swiss side, 4 UWs were interconnected. The challenge was in addition to

WT Energiesysteme at the following fairs
WT Energiesysteme will be represented at the following fairs: Hannover – HANNOVER MESSE – 24.-28.04.2017 – Hall 13, Stand B54 Husum – HUSUM Wind – 12.-15.09.2017 – Hall 4, Booth

Onshore wind farm in Markbygden north sweden
At around 4GW, Markbygden will be the largest onshore wind farm in Northern Sweden at one location in Europe and will increase the installed base of wind turbines in Sweden

transformer station Baumgarten Süd
In May 2017, Juwi Energieprojekte GmbH commissioned WT Energiesysteme GmbH to create a ready-to-use substation on a turnkey basis. The service description includes all services up to the handover of

transformer station Prutz 110 kV field extension line GKI 1 and GKI 2
WT Energiesysteme GmbH has been awarded the contract to extend the 220/110/25 (30) kV transformer station Prutz with two 110kV power lines GKI 1 and GKI 2. The following services

110/33kV transformer station Honsbronn
On 30.05.2018, the 110 / 33kV transformer station Honsbronn was handed over to the customer on schedule and ready for operation. The deliveries and services provided by WT Energiesysteme included,

Transformer station Bischdorf Süd III
A 110/30 kV substation is currently being built on the green meadow near Kittlitz in Brandenburg. WKN AG commissioned WT Energiesysteme with the turnkey construction of the substation, including a

Transformer station Zimmern
On time on 30.08.2018, the 110/20 transformer station Zimmer went to the TEN network. The company EDF EN Germany GmbH commissioned WT Energiesysteme GmbH to create a ready-to-operate substation with