In the Bernau area, northeast of Berlin, the energy generated by a wind farm is to be fed into the 110 kV grid of the network operator e.dis. For this purpose, we are constructing a new, operator-owned feed-in transformer station of the 110/21 kV voltage level. In the new substation to be built the 110 kV switchgear is located in outdoor technology and the MV switchgear in GIS technology, a 50 MVA power transformer, station control technology and all auxiliary systems required for proper operation.

 

Construction period: June 2020 to October 2020

 

Client: Vestas Deutschland GmbH