Transformer station Saßleben

umspannwerk sassleben

In the Calau supply network, PNE Wind AG expanded the field of regenerative energy with additional wind turbines. This required the construction of a new switchyard and switchgear. The substation in Saßleben newly built by WT energy systems supplies about 114 kilometers of medium voltage cables via 178 medium voltage stations including Babben, Beesdau, Bischdorf, Bronkow, Buchwäldchen, Calau, Craupe, Crinitz, Fürstlich Drehna, Gahro, Gollmitz, Göllnitz, Groß Mehßow, Laasow, Missen, Plieskendorf, Saadow, Saßleben, Tornitz, Werchow and Zinnitz, covering the needs of more than 6800 customers.

Voltage level:
110 kV / 30 kV

Power transformers:
2 transformers each 40MVA
Total power 80MVA

Client:
PNE Wind AG

utilities
Network power

Start:
Ba1: 17.12.2013
Ba2: 27.03.2014